Mechanical Construction for GeoChem at Brown

Recently completed 18 month project of mechanical infrastructure included two large air handlers which provide the building with heating, cooling, humidification control, chilled water, and pre- and reheat systems for maximum energy...

There is a Chill-er in the Air

A beautiful day to move this 5692lb Chiller over 40′ in the air at the Pawtucket Library. This air-cooled chiller will produce chilled water that is circulated through the library’s air conditioning equipment to remove unwanted heat from the building. Then, the...

Arden Keeps Snow from Sticking at Miriam Hospital

Miriam Hospital’s Emergency Room entrance in Providence, RI, was prepared and ready to deal with the recent freezing temperatures and icy pavement!  Their new Snow Melt System installed by Arden Engineering Constructors is providing that security and peace of mind....

Boiler Room with a View

The Tower at Carnegie Abbey. View from the Tower. A couple of weeks ago I had my first site visit as the new Marketing Specialist at Arden Building Companies at the Tower at Carnegie Abbey – one of the most luxurious waterfront residential buildings in New England....