Recently completed 18 month project of mechanical infrastructure included two large air handlers which provide the building with heating, cooling, humidification control, chilled water, and pre- and reheat systems for maximum energy efficiency.
![](https://www.ardeneng.com/wp-content/uploads/2020/03/GeoChem1.jpg)
![](https://www.ardeneng.com/wp-content/uploads/2020/03/GeoChem2.jpg)
![](https://www.ardeneng.com/wp-content/uploads/2020/03/GeoChem5.jpg)
![](https://www.ardeneng.com/wp-content/uploads/2020/03/GeoChem6.jpg)
Recently completed 18 month project of mechanical infrastructure included two large air handlers which provide the building with heating, cooling, humidification control, chilled water, and pre- and reheat systems for maximum energy efficiency.