Infinity Meat Solutions new $100M meat-packaging facility in North Kingstown, RI, started construction in October 2018 and is projected to be opened in the first half of 2020. The 200,000 sq-ft facility will create more than 700 food manufacturing jobs in Rhode Island producing beef and pork prepared meats for meal solutions.
The Infinity Meat facility is a joint project for Unique Metal Works, Arden Engineering Constructors and Earthwise Energy Technologies. UNIQUE will be providing and installing all duct work and accessories for the facility. ARDEN will work on the HVAC scope of the project installing four RTU’s to provide all heating and cooling needs for the space. Five MAU’s will also be installed providing 100% fresh air rather than recirculating stale air that could potentially carry odors and bacteria.
Earthwise will be furnishing and installing controls for 28 terminal air boxes, interlock wiring to the RTU’s and MAU’s, and monitoring hydrogen and sequencing on exhaust systems. All monitoring will be tied back to a central web-based supervisory controller where the customer will be able to manage their building using a graphic interface and receive text notifications if there is a problem that requires attention.