Questions?   Give us a call!   (401) 727-3500

Bristol Community College

Location:  Fall River, MA

Market:  Education

General Contractor:  Gilbane

Timeline:  October 2019 – September 2020

Contract Amount:  $7,765,200

Services Provided: 

  • Mechanical Construction
  • Plumbing
  • Building Automation Controls
  • Sheetmetal ductwork

Project Overview

Replacement of complete underground steam and condensate piping to support a new distributed heating system. Ten-foot deep trenches were created throughout the campus to incorporate the 8,600′ of carbon steel piping. The piping installation included a multi-step protection process using x-ray welding, insulation, leak detection wire, pressure tests, and several protective wrap layers. Three new replacement boilers were installed in the main boiler building and condensate receiver tanks in seven buildings. New underground polyethylene gas piping (4,400′) was installed to support seven new outside generators.

Building Controls included the development of a remote graphical user interface, integration to the boiler control system, alarming and trending, combustion air control, leak detection, and emergency shutdown.