New RISD Building Pre-Fab

Arden Engineering Constructors is just about ready to install bathroom elements for the new RISD, Rhode Island School of Design, Residence Hall in Providence RI.

The new building includes six floors accommodating approximately 148 students. Each floor has its own bathroom with toilets and showers. The piping for the bathrooms was created off-site in Arden’s pre-fabrication shop.

Pre-fabrication is a modular pipe construction allowing entire sections – no matter how complex – to be created prior to installation. This reduces the time needed on a job site and provides fast and easy installation.