Milford Regional Medical Center

820KW Combined Heat & Power Plant

Project Overview

Serving a region of over 20 towns, Milford Regional Medical Center has expanded in size and capacity with the recent addition of a 78,000 square-foot building housing a new emergency department. In an attempt to save on energy costs, Arden Engineering Constructors, LLC was selected to manage the mechanical installation of a new 820kw combined heat and power (CHP) system. Given that installation of the CHP System was adjacent to patient rooms, Arden successfully coordinated work so that interruptions to sensitive hospital operations were kept to a minimum.

Project Specifications

Contract Amount: $360,000

Construction Manager: Waldron Engineering

Engineering Consultant: Waldron Engineering

Facility Type: Healthcare

Schedule: October 2015 – December 2015

Project Location: Milford, MA

Download Case Study (PDF)

Services Provided

Mechanical Installation

CHP Rigging & Assembly

CHP Exhaust Ducting & Stack

 

Highlights / Achievements

Aggressive timeline allowed for the realization of full utility incentives

Coordinated field installation, so as to diminish interruptions to sensitive hospital operations

Value Delivered

Generating both thermal and electric energy, the CHP system provides Milford Regional Medical Center considerable cost savings by reducing its reliance on utilities. With an impressive turn-around time of just one year from inception to completion, including Arden’s efficient two-month field installation process, MRMC successfully realized full utility incentives.