When global research-based healthcare company Pfizer decided to relocate its Single Dose Module (SDM) facility from Minneapolis, MN to Groton, CT, Arden Engineering Constructors was selected to manage the fabrication and installation of mechanical building systems on an incredibly fast-paced schedule.
Arden’s experience with pharmaceutical process piping coupled with the firm’s extensive pre-fabrication capabilities have allowed for prefabrication on all aspects of the project, including high-purity piping. By constructing piping upfront in a controlled environment, and then working closely with the rm’s locally based sister company M.J. Daly on installation, Arden is delivering high-quality piping to Pfizer more economically and more expeditiously.